UHills Streets Committee Meeting Minutes,
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Total |
Standards/Recommendations |
Measurements |
Unit Costs |
|
$4,120,000 |
City |
R&J |
City |
|
$3,570,000 |
R&J |
R&J |
R&J |
|
$3,710,000 |
City |
City |
City |
|
$2,025,000 |
R&J |
City |
City |
The data used for assessment estimates based on lot
acreage has been reviewed and has found that approximately 1/3 of the lots are
not accurately represented.
A summary 1-page spread-sheet has been developed that
gives current estimates for the following:
-
City (Park)
-
Church
-
Multi-party residence
-
Single-party High
-
Single-party Mean
-
Single-party Median
-
Single-party Low
for three project costs ($500K,
$1.5M, $3.4M) for each of 4 assessment methods:
-
-
Valuation
-
Frontage Feet
-
Per lot
This summary page will be posted to the web site with
some explanatory text.
The current view is that for U. City to finance a NID
through existing funds (i.e. without seeking financing) would require the
project cost to probably be under $300K. (via Frank
Ollendorf?)
REPORT of the Communications Subcommittee:
The subcommittee has begun work on a final report. There
is an outline and some text written. It is not in a state that is ready to
share with anyone yet.
The subcommittee has been investigating Google and Yahoo
search engines and how to get the neighborhood web site to show up on their
searches.. The best way to get a site to show up with
a search engine is to have the site linked from other sites. Search engines
gather their information by "crawling" around internet. Web sites can
also be submitted for inclusion with the search engines. This has been done for
our web site, but there doesn't seem to have been much change yet.
It had been suggested that we might put up signs around
the neighborhood to encourage residents to visit the web site. This was
discussed within the subcommittee which decided it would be better to do another door-to-door
flyer.
TASK LIST for Engineering Subcommittee
1.
Evaluate options for a "pay as you go"
plan for continued maintenance and repair.
2.
Continue the inventory of the streets.
3.
Work with trustees to feed the information that
is being gathered so it can feed into future plans and priorities.
4.
Continue discussions with MSD
TASK LIST for Legal/Finance subcommittee:
1.
Work with communications subcommittee on text to
accompany summary spread-sheet
2.
Contact surveyors about the possibility of
getting accurate acreage measurements if they should be needed.
3.
Investigate the possibility of increases to the
regular assessment.
TASK LIST for Communications subcommittee:
1.
Add summary spread-sheet and text description to
web site.
2.
Continue work on final report.
3. Take photographs of sample pavement, curbs and gutters and post on web site.
Next Meeting: August 1st at First Presbyterian church at
Attached: Engineering Subcommittee Summary
Reference Material: Engineering Subcommittee support data spread sheet
Engineering Subcommittee Summary
Accomplishments, June, 2005
Inspected curb, gutter, and interface on Purdue and Overhill. Marked Purdue and Overhill with white, temporary, paint. See summary below.
Reviewed storm-water inlet structures and drainage with MSD area maintenance manager. Obtained unofficial agreement that MSD will repair/replace substandard inlets at their cost over the next year. Also obtained unofficial agreement that new drainage structures will be installed by MSD.
Obtained updated unit costs for curb, gutter, and pavement repair:
Remove and replace curb and gutter and patch interface - $26/ft.
Remove and repave pavement at interface - $6/ft
Remove and replace pavement and base - $4/sqft.
Install chip seal (estimate only) - $100.000
Reviewed engineering alternatives. See below.
Prepared 20-year cost for currently-favored alternatives. See Below.
Obtained agreement from
Curb, Gutter, and Interface Summary
|
Street |
Scaled Length |
Aprons |
Curb and Gutter Total |
C&G Repair |
C&G Fraction |
Interface Repair |
Interface Fraction |
|
Kingsbury |
4100 |
38 |
3644 |
983 |
27% |
615 |
15% |
|
|
1600 |
23 |
1324 |
545 |
41% |
240 |
15% |
|
Purdue |
3270 |
36 |
2838 |
1161 |
41% |
480 |
15% |
|
Overhill |
1960 |
9 |
1852 |
890 |
48% |
110 |
6% |
|
|
|
|
|
|
|
|
|
|
Total |
10930 |
106 |
9658 |
3579 |
37% |
1445 |
13% |
|
|
|
|
|
|
|
|
|
|
Note: |
Kingsbury
and Warren Interface Length estimated at 15% of Scaled Length |
||||||
|
|
Apron
length estimated at 12 ft. |
|
|
|
|
||
|
|
Curb and
Gutter Total = Scaled length - (aprons x 12) |
|
|
||||
|
|
C&G
Repair = C&G Measured Length |
|
|
|
|||
|
|
C&G
Fraction = C&G Measured Length / Curb and Gutter Total |
|
|||||
|
|
Interface
Repair = Interface Measured Length |
|
|
|
|||
|
|
Interface
Fraction = Interface Measured Length / Curb and Gutter Total |
||||||
Engineering Alternatives
The following alternatives have been considered:
1. Continued Maintenance and Repair
2. Selected Curb and Gutter Replacement (2 cycles)
3. 100% Curb and Gutter Replacement (1 cycle)
4. Reitz and Jens Proposal
Cost Evaluation
Costs for Alternatives 2 and 3 are described below:
Twenty year costs are estimated as follows:
For 2 cycle C&G Replacement
37% C&G Replacement in year 1, 63% in year 10.
13% Interface Replacement in year 1, 4% in year 10.
0.5% Street Patching in years 1 and 10.
Chip Seal in years 1 and 10.
Selected Street Repair in year 1.
For 1 cycle C&G Replacement
100% C&G Replacement in year 1
10% Interface Replacement in year 10.
0.5% Street Patching in years 1 and 10.
Chip Seal in years 1 and 10.
Selected Street Repair in year 1.
Costs for Alternatives 2 and 3 are summarized below:
|
|
Inlets by MSD |
Inlets by UH |
|
2 C&G
Cycles |
|
|
|
Year 1 |
404,375 |
473,375 |
|
20 Year |
948,865 |
1,017,865 |
|
|
|
|
|
1 C&G
Cycle |
|
|
|
Year 1 |
799,055 |
868,055 |
|
20 Year |
938,239 |
1,007,239 |
Driveway Aprons
The Engineering Subcommittee has considered the subject of driveway apron replacement but has not performed an inventory of apron conditions nor has it included apron replacement costs in its estimates.
The trustees have indicated that they have replaced aprons on a case-by-case basis. The Subcommittee generally recommends that the Trustees continue this practice. Where that portion of the apron that comprises the gutter is significantly cracked and broken, that portion should be saw-cut and replaced as part of the curb and gutter replacement program.
Whether or not a car “bottoms out” on a driveway apron may have as much to do with the vehicle or the street grade as with the apron. It is unlikely that many apron alignments have changed significantly since properties were purchased. Realignment of an apron to eliminate “bottoming” while maintaining adequate drainage will be far more difficult and expensive than like-for-like replacement of broken or crumbling concrete. We recommend that the trustees continue the practice of replacing aprons on a case-by-case basis.
Creveling
The Subcommittee has presumed that Creveling’s curb/gutter will be replaced as required on a like-for-like basis. Installation of curb and gutter that matches the remainder of the neighborhood would require significant change of the yard grade where it meets the curb. As residents currently park on the roll curb, replacement with a conventional curb and gutter would effectively narrow the street.
The subcommittee has not proposed installation of sidewalks
to match the remainder of the neighborhood.
We see little justification for such an encroachment on the homeowners’
front yards.

Web site designed, created and maintained by Douglas Digital